Geological Modelling and Resource Estimation Software

Geological modelling software turns drillhole data into a three-dimensional model of an orebody and an estimate of the tonnes and grade it contains. The workflow runs from a validated drillhole database, through wireframed mineralisation envelopes, to a block model populated by grade interpolation, usually ordinary kriging or inverse distance. Output feeds mine planning and, when produced by a competent person under an accepted code, a JORC or NI 43-101 compliant resource statement.

Mine Management Software·8 min read·Updated 2026-08-09
Three dimensional geological block model on a workstation screen

Geological Modelling & Resource Software Specifications

The figures below describe typical industry specifications for this class of equipment rather than a single fixed model. Use them to scope a requirement, then confirm exact figures against the supplied unit before purchase.

Typical specification range for the Geological Modelling & Resource Software
SpecificationTypical value
Drillhole databaseCollar, survey, assay and lithology tables with validation
Data validationOverlap, gap, out-of-range and survey deviation checks
CompositingFixed length or geology-honouring downhole composites
Statistical toolsHistograms, probability plots, top-cut analysis, variography
WireframingExplicit sectional or implicit modelling from grade shells
Block modelRegular or sub-blocked, rotated to the orebody orientation
Interpolation methodsOrdinary kriging, inverse distance, nearest neighbour
ClassificationMeasured, Indicated and Inferred by search and confidence criteria
ValidationSwath plots, visual section checks, comparison against composites
ReportingGrade-tonnage curves and JORC or NI 43-101 tables
DeploymentDesktop workstation; some cloud-collaborative options
InteroperabilityDXF, CSV, ODBC and common mine planning formats

What a Geological Modelling & Resource Software Is Used For

  • Drillhole database management and validation
  • Mineralisation wireframing and domaining
  • Block model construction and grade estimation
  • Mineral resource classification and reporting
  • Pit optimisation and mine planning input

Maintenance Schedule

Most premature failures in this equipment class trace back to a missed routine check rather than a design fault. The intervals below are a practical starting schedule; adjust them to your duty cycle and the manufacturer manual.

Recommended maintenance intervals
IntervalTask
On every data loadRun the full validation suite before modelling; unvalidated assay data is the origin of most resource errors.
WeeklyBack up the drillhole database and model files with versioning, not overwriting.
Per estimateDocument every parameter (search ellipse, top cut, density, composite length) so the estimate is reproducible and auditable.
AnnuallyReconcile the model against actual mined tonnes and grade; persistent bias means the estimation parameters need revisiting.

Frequently Asked Questions

What software is used for resource estimation?

The commercial mainstays are Datamine, Micromine, Surpac, Vulcan and Leapfrog, with the open-source ecosystem around Python and GSLIB used for specialised geostatistics. Choice matters less than the competence of the estimator. All of these tools will faithfully produce a wrong answer from bad parameters.

Do I need software to report a JORC resource?

Practically, yes. A JORC-compliant estimate requires documented, reproducible methodology with validation, and that is not achievable in a spreadsheet for anything beyond a trivial deposit. The Competent Person signing the statement will expect a defensible modelling workflow.

What is a block model?

A three-dimensional grid of cells covering the deposit, each carrying estimated grade, density, rock type and classification. It is the numerical representation used for reporting resources and for scheduling what gets mined and when.

What causes resource estimates to be wrong most often?

Bad input data and unexamined assumptions, not the interpolation algorithm. Unvalidated assays, missing or wrong downhole surveys, inappropriate top-cutting of high grades, and density assumed rather than measured account for most large reconciliation failures.

Supply and Delivery Across Tanzania

Bart Mining supplies geological modelling & resource software and related equipment to mining operations throughout Tanzania, with primary coverage of the Lake Victoria Goldfields (Mwanza, Kahama, Geita, Shinyanga and Bukombe), alongside the Lupa Goldfields around Chunya and Mbeya, and delivery nationwide from Dar es Salaam.

MwanzaKahamaGeitaShinyangaBukombeNyangʼhwaleTaboraDodomaArushaMbeyaChunyaSongweDar es SalaamMorogoroMtwaraKigoma
Specification note. The values on this page are industry-standard ranges for the equipment category, published so buyers can scope requirements before enquiring. They are not a quotation and do not describe a specific stocked model. Contact us with your duty, site conditions and power supply for a specification and quotation against your actual requirement.

Request a quotation

Need a geological modelling & resource software specified for your site?

Tell us your duty, depth or throughput and available power supply. We will come back with a specification and price, and flag anything on site that needs to change to make it work.